Open Shield Tunneling

Open shield tunneling is a sequential excavation method used to construct tunnels in areas where surface disruption, limited access, or ground conditions make open-cut installation impractical. CRS Contractors performs open shield tunneling for utility and infrastructure crossings that require controlled excavation and continuous ground support throughout construction.

Open Shield Tunneling

When It’s Used

Open shield tunneling is commonly selected for:

  • Crossings beneath active roadways, rail corridors, or developed areas
  • Installations in constrained sites where open-cut excavation is not feasible
  • Projects requiring tunnel support as excavation advances through variable ground conditions

Our Approach

CRS Contractors evaluates subsurface conditions, loading above the tunnel, shaft access, and alignment requirements early in project planning. The company sequences excavation and open shield installation to maintain support at the face and along the tunnel as work progresses, helping reduce settlement risk and maintain control in sensitive or heavily constrained environments.

Featured Projects

CRS Contractors Image

South Hartford Conveyance and Storage Tunnel: Consolidation Conduits (Contract No. 5)

Hartford, CT

Collection Systems

Hartford, CT

Learn More
CRS Contractors Image

CT DOT Job #033-133-Emergency Declaration Project Cromwell, CT

Cromwell, CT

Open Shield Tunneling

Cromwell, CT

Learn More
CRS Contractors Image

Up Smith’s Creek Community Complex Bulkhead Replacement-Woodbridge

Woodbridge, NJ

Bulkheads / Piles

Woodbridge, NJ

Learn More
CRS Contractors Image

Replacement of Mercer County Bridge No. 250.3 Carter Road-Hopewell-Mercer County

Hopewell, NJ

Roads & Bridges

Hopewell, NJ

Learn More

Trusted By Industry Leaders

Served Logo
Served Logo
Served Logo
Served Logo
Served Logo
Served Logo
CRS Contractors field crew working on underground public infrastructure and utility construction project

Start Your Project With Confidence

Engage early to reduce risk, delays, and costly change orders.

Schedule a Project Review
Loading